Bujagali Hydropower Generation Project Carbon Offset

$4.00/ tonne

  • Stabilize electricity production and prices in Central Africa
  • Stimulate support for rural electrification programs in central Africa
  • Avoid the use of costly and unreliable diesel-fired generators for schools, universities and hospitals

Volume

tonne

Uganda has long suffered from a lack of electricity, and the problem has become acute in recent years. The Bujagali Hydropower Project is a run-of-river hydropower facility on the Victoria Nile in the Republic of Uganda. The total installed capacity of the project consists of five 51 MW turbines, which are estimated to supply 1,404 GWh per year to the local electricity grid. It is located at Dumbbell Island, approximately 8 km downstream (i.e. north) of the Town of Jinja.

Reliable access to electricity allows for offering better services for public institutions such as night classes at Universities and diagnostic tests at clinics. The project provides clean and reliable energy to the project create unskilled and semi-skilled job opportunities for Uganda workers. Additionally, the project spends an extra 2,8 million USD per year on projects ranging from environmental conservation to health and sanitation.

Avis

Il n’y a pas encore d’avis.

Seuls les clients connectés ayant acheté ce produit ont la possibilité de laisser un avis.

Catégorie :

Nous contacter

Ce n’est pas un sujet facile. Nous avons compris. Veuillez consulter notre section FAQ ou nous contacter si vous avez des questions ou souhaitez en savoir plus. Si vous êtes un fournisseur ou un développeur de projet dans le domaine de l’élimination ou de la réduction du carbone, nous aimerions également avoir de vos nouvelles.

© 2022 Azzera, Inc. All rights reserved.